This was done in less than a day. There was three feet of snow on the ground and it was about ten degrees outside
It's a 4 section with a tankless coil and a Carlin Burner. We also ran a new oil line overhead. The hardest part was dragging it through the snow to get it into the basement
Attachment: whitWMsm.jpg (Downloaded 289 times) Last edited on Wed Apr 20th, 2005 03:58 am by Al Gregory
|